Snohomish County Highway and construction Updates
I-5 Everett bridge inspection Saturday
If you’re headed north on I-5 Saturday morning – maybe headed to the Skagit Valley Tulip Festival (see below) – be ready for some potential slowdown near the SR 526/SR 527 interchange. WSDOT bridge maintenance crews will be doing bridge inspection work that will close two lanes from about5:30 a.m. to 9:30 a.m. A single lane will remain closed until about 2 p.m.
Full SR 522 ramp closure Monday night
Monroe drivers should prepare for a full closure of the westbound SR 522 ramp to West Main Street/164th Street Southeast from 7 p.m. Monday, April 13 until 5 a.m. Tuesday, April 14. The section of West Main Street/164th Street between Fryelands Boulevard and the east roundabout will also be closed from 10 p.m. Monday to 5 a.m. Tuesday (a signed detour will be in place). During the closure, contractor crews working for WSDOT will continue their work on the new roundabout on the west side of SR 522. This is part of the SR 522 widening project.
Improved traffic flow coming to SR 99 in Everett
A project that will improve traffic flow on SR 99 at Airport Road in Everett begins this coming week. Contractor crews working for WSDOT will begin removing parts of traffic islands in both directions of SR 99 at Airport Road to create a third, bus-only through lane. Right now, the islands extend into the right lane, requiring vehicles to turn onto eastbound or westbound Airport Road. Once the islands have been reduced, about 150 Community Transit buses each day will be able to proceed through the intersection in the right lane. Cars and trucks can also use the lane but will have to make right turns onto Airport Road. Some other work is included in the project as well. No traffic control is planned for this coming week but there will be some lane closures in the future so be sure to stay plugged in to our Northwest Construction Update page.
Full southbound SR 529 closures complete
Full southbound closures of SR 529 between Marysville and Everett are finished, which is great news for drivers who have been detouring to I-5 while workers do maintenance work on the Snohomish River Bridge. We’ll still have some single-lane closures between 10 a.m. and 8 p.m.Monday, April 13 through Thursday, April 16 so be prepared for some delays.
Remember, it’s tulip time
I’ll admit it, I drove to Bellingham on Easter and forgot about traffic headed to the Skagit Valley Tulip Festival. It’s not a mistake I’ll make again. So I’ll remind myself and you, prepare for significant traffic delays, especially on weekends, headed to the tulip fields. If you can, leave very early or as it gets dark. Otherwise, pack patience, great tunes and avoid the Big Gulps because it could be a real slow-go in the Mount Vernon area.